Key
Indicators of the Project
|
|
|
 |
| |
|
Dam
|
| Location |
Sandouping
Town in Yichang, Hubei Province, China
|
| Construction
Period |
17
years 1993-2009
|
| Height
of Dam |
Altitude
185 Meters
|
| Length
of Main Dam |
1,983
Meters
|
|
Length of Generator Group on Right Bank |
584.2
Meters
|
| Flood
Dam |
483
Meters |
| Length
of Generator Group on Left Bank |
643.6
Meters |
| Quantity
of Concrete |
27
Million Square Meters
|
|
Reservoir
|
| Capacity |
39,3
Billion Meters
|
| Water
level |
Altitude
175 Meters
|
|
Change of Water Level each year |
30
Meters
|
| Area |
1,084
Square Kilometers
|
| Length |
600
Kilometers
|
|
West Point |
Baisha
Town, Jiangjin City,Chongqing
|
| East
Point |
Sandouping
Town in Yichang, Hubei Province
|
|
Navigation
Construction
|
| Double-lined
Route Five Levels ship locks |
Length
|
280
Meters |
|
Wide
|
34
Meters |
|
capacity
|
10,000T
|
|
Vertical ship-lift |
Enable
take 3,000T ships
|
|
Power Station
|
|
Generator |
26
|
|
Capacity |
18.2
MillionKW.
|
|
Quantity of Power |
84.68
BillionKW.
|
|
Investment
|
|
18,00
Billion RMB
|
|
Immigrating People
|
|
About
1,13 Million
|
|
|
 |
|
 |
|
|